Suction Moulding Luggage Cases
Design & Size | Customized 2D or 3D drawing provided by client,Within size 3000*2000*1000 mm. |
Material | ABS, PS , PMMA, PVC, PC , PP,HDPE, PETG, PET Optional |
Thickness | From 1mm to 12mm |
Feature | Eco-friendly, Durable, Safe to use, Superior quality. |
Sample Time | 7 days, Free Sample |
Cost Ddvantage | The mold development cycle is 1/8th of the injection molding process, and the development cost is 1/10th of the injection molding process. The qualification rate is as high as 98.5%. |
Color&Logo | Customized |
Surface Texture | Fine Sand, Matte,Lichee, Diamond, Leather, Finely, Glossy, Coarseetc. |
Packing | Poly bag+Export carton,Wood box or as customer’s requirements |
Product Introduction
Thick sheet blister processing is widely used, one of the more common is luggage shell blister, because blister compared to injection molding, the cost will be much lower, so many people luggage shell will choose blister, if you have a good idea, but do not know what material shell we are willing to provide you with help and technical support, look forward to your call
Q: Are you a trading company or a manufacturer?
A: We are a professional manufacturer of thick sheet blister products. We trade our products directly with our customers.
Q: Can we use our own logo?
A: Yes, we can print your private logo according to your request.
Q: When can I get the price?
A: Usually we quote within 24 hours after we get your inquiry.
Q: How long is your delivery time?A: The general delivery time is 30-45 days after receiving your order confirmation. Anther, if we have the goods in stock, it will only take 1-2 days.
QUALITY CONTROL
We have QC person stay on the production lines do to the inspection.All products must have been inspected before delivery.we do inline inspection and final inspection.
1.All raw material checked once it arrive our factory.
2.All pieces and logo and all details checked during production.
3.All packing details checked during production.
4.All production quality and packing checked on final inspection after finished.